Cost reduction in material handling

Cost reduction in material handling: Building materials company simplifies wiring thanks to ASi (2:10)

LIP Bygningsartikler saves now 22% of the total cost on their conveyor modules thanks to an ASi solution from Bihl+Wiedemann. Each module and the complete system is connected through an ASi network with integrated safety from Bihl+Wiedemann. New conveyor modules can be added simply without additional wiring from the main PLC.

 Applications