Waterworks increase safety and flexibility with ASi-5

The Englerup waterworks in Vestsjaelland, Denmark, has installed a new SCADA control system – with an AS-Interface solution at its heart. All pumps, valves and other components are now connected in a network that is controlled by an ASi master. The cabling effort was minimal because the 2-wire ASi cable transports both data and power. Expanding the system is also easy, as one ASi Master can manage more than 100 devices.

 

ASi-5 Motor Modules are conveniently configurable

The solution also includes many ASi-5 Motor Modules BWU4980, which were specially developed for Danfoss frequency inverters from the VLT series. Thanks to the software from Bihl+Wiedemann, configuration is very convenient: it only takes place in the first frequency inverter and can then be transferred to other devices.

 

ASi-5 technology enables faster transmission of larger amounts of data – and thus paves the way for Industry 4.0. ASi-5 delivers short cycle times with up to 384 digital inputs and outputs in 1.27 ms and is fully compatible with all previous ASi devices and ASi generations.


Englerup now has a flexible, simple and reliable system and is ideally equipped for future requirements.

Latest application reports

Waterworks increase safety and flexibility with ASi-5

The Englerup waterworks in Vestsjaelland, Denmark, has installed a new SCADA control system – with an AS-Interface solution at its heart. All pumps, valves and other components are now connected in a network that is controlled by an ASi master. The cabling effort was minimal because the 2-wire ASi cable transports both data and power. Expanding the system is also easy, as one ASi Master can manage more than 100 devices.

ASi-5 guides storage and retrieval machine safely through the aisles

Klinkhammer Intralogistics relies on safety solutions from Bihl+Wiedemann for the new storage and retrieval machine (SRM) in an automated high-bay warehouse. ASi-5 Safety Gateways connected via Safe Link enable safe communication between the moving stacker crane and the control cabinet. Accelerating and decelerating the stacker crane as quickly as possible maximizes the throughput of goods.

ASi-5 simplifies RIELEC installations

Thanks to the ASi-5 technology, RIELEC Logistic Systems reduces installation costs and increases the flexibility of its projects. One of the key benefits of AS-Interface is that it enables machines to be assembled and disassembled quickly and easily. In addition, signals of all types can be easily integrated into the communication bus. The RIELEC Fit Sorter package sorter uses ASi-5 to control LED strips and to monitor conveyor belt sections. The ASi-5 gateways are responsible for collecting process and diagnostic information which is then transmitted to both the PLC and the cloud.

Predictive maintenance thanks to ASi-5 and IO-Link

SPAX International produces up to 50 million screws each day. To make the machines in production Industry 4.0-capable, the company relies on ASi-5/ASi-3 PROFINET gateways with an integrated safety monitor and compact IO-Link masters. The machines can be easily converted and now facilitate predictive maintenance. In addition to digital information, IO-Link devices can now also provide process and diagnostic values.

Danish brewery saves over 2.5 km of cable thanks to ASi

The brewery, which recently opened in April 2019, was designed and built by the brewery experts GEA Process Engineering A/S. All the brewery’s processes including ASi Masters and motors are controlled via PROFINET by two Siemens PLCs. All the brewery’s processes including ASi Masters and motors are controlled via PROFINET by two Siemens PLCs. All the tanks, kettles and plant components can be mutually connected by means of a system of 744 pneumatically activated process valves – controlled by eight ASi Masters from Bihl+Wiedemann. The ASi network also links together instruments and sensors that record the process data from each fermentation tank, such as the pressure, level and temperature.

Ardo A/S are now saving forklift time in their freezer room

LIP Bygningsartikler saves now 22% of the total cost on their conveyor modules thanks to an ASi solution from Bihl+Wiedemann. Each module and the complete system is connected through an ASi network with integrated safety from Bihl+Wiedemann. New conveyor modules can be added simply without additional wiring from the main PLC.

Building materials company simplifies wiring thanks to ASi

LIP Bygningsartikler saves now 22% of the total cost on their conveyor modules thanks to an ASi solution from Bihl+Wiedemann. Each module and the complete system is connected through an ASi network with integrated safety from Bihl+Wiedemann. New conveyor modules can be added simply without additional wiring from the main PLC.

Would You Like to Share Your Success Story?

Are you also enjoying the benefits of an exciting Bihl+Wiedemann application? And would you like to share your success story with interested people from all over the world? We would be delighted to present your story in an application report alongside an illustrative video. Get in touch with us!

 

Contact us now